How an engagement runs, from first call to handover
Every project with CodeYep follows the same order of steps. Each produces something the next depends on; skipping one is a common way for outsourced projects to go wrong. Each phase length is fixed in the written scope, with each milestone and its date, and those are the dates to hold us to.
The table below shows the seven steps, what each produces, and what you decide at the end of it.
What happens in the scoping conversation
The first conversation is about your problem, not our pitch. We ask what the software must do, who uses it, which systems it must talk to, what drives the deadline, and your budget band. You do not need a specification. You do need to know what success looks like, and who on your side can decide.
If you need to share anything confidential, say so. CodeYep signs a mutual NDA before detailed project discussions on request. Mutual matters: a one-way NDA protects only one side, so check which side it is.
Bring existing documents, screenshots of the current process, a list of integrations, and any compliance constraint such as payment or health data. Raise contracting and data questions for your region in the first call.
If you bring an existing codebase, the work starts with a code audit before we take it over: how the code is structured, what the tests cover, dependency and security findings, how it builds and deploys, and what is undocumented. The findings go into the written scope.
You get back a written summary of what we understood, the open questions, and a route to a written scope. If we are not the right fit, we say so now rather than after you have signed.
What a good written scope contains
Every engagement starts from a written scope that both sides agree before build work begins. It is the most useful document you can demand from any vendor. A proposal sells; a scope commits.
A written scope worth signing covers:
- Goal and success measures. The business outcome, and how you will know the software achieved it.
- Users and journeys. Each user role and what it must do.
- In-scope features, prioritized. Must-have, should-have and later, so a budget squeeze cuts the right things.
- Explicit exclusions. A written list of what is not included stops assumed work turning into a dispute.
- Integrations and data. Every external system, the direction of data flow, and who supplies API access and test accounts.
- Non-functional requirements. Performance targets, availability, recovery point and recovery time objectives, security, accessibility conformance level, supported devices and browsers, data residency.
- Environments and accounts. Which cloud and repository host, both created in your name.
- Acceptance criteria and definition of done. What finished means: reviewed, tested, deployed to staging, documented.
- Milestones and what each produces. Named deliverables, not percentages.
- Engagement model and billing. Fixed scope, time and materials or dedicated team, with billing basis, invoice schedule and any cap.
- Change process. How a change is raised, estimated, approved and billed (see below).
- Working hours and communication. The hours both teams are online at the same time, the meeting and demo rhythm, the shared channel, and the escalation path with who answers at each step.
- Assumptions and dependencies. What the vendor needs from you, by when.
- IP, confidentiality and exit. Who owns what, when ownership passes, and what happens if either side ends the contract early.
What each model costs is covered under rates and engagement models. The ownership and confidentiality clauses are explained under code ownership and security terms.
What discovery and design produce
Discovery turns the written scope into something engineers can build without guessing. It is where expensive mistakes are still cheap to fix. Expect these outputs:
- A domain model: the entities in your business, how they relate, and the vocabulary used in code and conversation.
- Architecture decisions written down with the alternatives rejected.
- A data model with a migration plan if existing data moves, and API contracts for each integration.
- Where the software has a user interface, a clickable prototype of the main journeys, tested with a few real users where possible; for the riskiest integration or component, a short technical spike that proves it works.
- A prioritized backlog with an estimate per item and the assumptions behind each estimate.
- A risk list with an owner and mitigation for each risk.
- An environment plan: development, staging and production, who owns each account, and how releases move between them.
If discovery ends with a slide presentation and no backlog, it was a sales exercise. Discovery can also change what the scope assumed. When it does, the scope is amended through the change process before build starts. On a fixed-scope project, confirm price and milestones against the discovery backlog, and ask any vendor what happens to the price if discovery finds more work.
How the build runs and what you see at each review
Build work runs in short iterations. Each has a goal agreed in advance, ends with a review of working software, and feeds the plan for the next. Ask any vendor for four things from the first day of build.
You hold the repository. Source code repositories are set up in your name, so you see commits as they land, not a zip file at the end.
Every merge is reviewed and tested. Ask that code reaches the main branch only through a pull request another engineer has approved, with branch protection on, and through an automated pipeline that runs the test suite and scans dependencies and secrets. Ask to see the pipeline and branch settings. If the team uses AI coding assistants, ask which tools see your code and whether it can train a model, and confirm generated code gets the same review and tests as any other. The detail is under code ownership and security terms.
Every review shows running software on your environment. Ask for staging in your cloud account, with login between reviews. For a mobile app, the equivalent is a build you install from TestFlight or a Google Play testing track in your own developer accounts.
Every iteration ends with a written summary. Ask for one page covering what was completed against the iteration goal, what is next, risks, decisions needed from you with a date, and the budget position. A vendor that cannot write this in a page does not know where the project stands.
Who you talk to, and how communication works across time zones
Agree in the written scope who makes delivery decisions and how you reach the engineers directly. Name one accountable lead, and fix a three-step escalation path with a written response time for each step. Any change to the people on your project should be announced before it happens, with an overlap period.
A distributed team works when the working rules are written down: the daily window when both sides are online, which channel is used for what, how quickly a message is answered inside that window, and who can decide while you are offline. Keep decisions in writing. Swap public holiday calendars at kickoff; daylight saving changes on either side can move the overlap. See the regions we work with for regional questions.
How change requests work under each engagement model
Change is normal. What matters is that each change is visible, estimated and approved before it costs money. The mechanism depends on the engagement model.
The table below shows how a change should be handled under each of the three models CodeYep offers.
A dedicated team suits products where change is constant and you want to own the backlog; see dedicated development teams. A fixed scope suits a well-defined deliverable with a hard budget. Time and materials suits work where the direction is clear but the detail will change, with the vendor still running delivery and reporting hours as they are billed. The tradeoffs between the first two are compared in fixed price versus time and materials.
How testing and release work
Testing does not wait for the end. Expect automated tests to run on every change before it merges, from the first iteration, and the acceptance criteria in the written scope are the basis of the acceptance tests. Before release the whole system is exercised end to end, under load if the scope sets targets, and by your own users.
Before go-live you should receive a test report with open defects and severities, the results of any load, security or accessibility testing the scope called for, and a user acceptance checklist you run yourself.
Release follows a checklist written and reviewed before the day. Before go-live, confirm each of these:
- Production accounts, domains and app store developer accounts are in your name, with signing credentials held there.
- Secrets sit in a secrets manager you control, not in developer hands.
- Backups run, and a restore has been tested.
- Monitoring and alerting are live, and you know who gets paged.
- A rollback plan exists, covers database migrations (reversible, or a tested roll-forward), and has been rehearsed on staging.
After release comes a period of close watching, often called hypercare, when the team that built the software watches production closely. What it covers, and for how long, belongs in the scope. Agree how a defect found after acceptance is told apart from a change, and who pays for each. A run-phase support arrangement should state severity levels, response targets, hours of cover and how small changes are billed.
What you receive at handover, and what the run phase looks like
Handover is simpler when the repositories and cloud accounts are yours from the start, as they are with CodeYep. The client owns the code and intellectual property CodeYep writes for them, assigned in the contract. The aim is that your team, or your next vendor, can run the system without the vendor.
A complete handover package from any vendor should contain:
- Confirmation that you hold owner rights on every repository and cloud account, with the vendor's access removed as you choose and every credential it could see rotated, and confirmation that every domain, app store and third-party account the product uses is registered to you.
- Infrastructure as code for every environment, so any environment can be rebuilt from the repository and, with data, from backups.
- Architecture documentation and decision records matching what was built.
- Runbooks: deploy, roll back, restore from backup, rotate credentials, respond to each alert.
- The CI pipeline, the full test suite and the last test report, plus a software bill of materials in a standard format such as SPDX or CycloneDX, covering dependencies and their licenses.
- A credentials inventory: every secret the system uses and where it lives, never the secrets themselves.
- An open-issues list: known defects, technical debt and the reasoning behind shortcuts.
- Recorded knowledge transfer sessions with your engineers.
The run phase then takes one of three shapes: continued work with us on fixes and changes under time and materials, a dedicated team for ongoing development, or a full takeover by your in-house engineers. Say in the scope which one you intend; it changes how much knowledge transfer is needed.
Warning signs during delivery, and what to do about them
Drifting projects tend to show warning signs early, while there is still time to act. The first is any of the four build conditions above going missing: no repository access, merges without peer review or a passing pipeline, demos that are not running software on your environment, or a written summary that stops or goes vague. Three more to watch:
- Ninety percent done, two reviews running. Ask which acceptance criteria pass today.
- Team members change without notice. Get the roster and notice terms into the scope.
- Accounts in the vendor's name. Cloud, domain or app store accounts you do not control are a lock-in and security risk. Move them before go-live.
When you see any of them, raise it in writing with a date for a response and ask for a re-plan against the written scope. The guide to how to choose a software development company covers how to test for these risks before you sign, and agency, freelancers or in-house compares the alternatives.
Ready to start with a scoping conversation?
Tell us what you want to build, who will use it and what is driving the timeline. If you want an NDA first, say so. Read about CodeYep for who we are a fit for and who signs your contract, or start a scoping conversation now.